TechCrunch AI1h agoenergy 123
How backlash and red tape continue to slow data centers post-Blue Wave
The data center boom is running into serious real-world obstacles, from widespread local opposition and permitting delays to a scramble for electricity. Before those challenges even come into play, though, there’s a more basic problem: A lot of the projects being announced may never get built in the first place. With billions of dollars in AI infrastructure [...]
This source publishes only a summary in its feed, so the full article lives at the outlet. The link above and below goes to the original.